mobi
 
 
contact
Current Location Current Location:HOME > PRODUCTS > Multi-Layer Frame >
 
Multi-storey steel structure motorpool shed

Multi-storey steel structure motorpool shed

How to carry out maintenance on the steel structure of the multi story steel structure house and car shed? 1. When cleaning the steel structure walls in Xinjiang, attention should b......

Product Description

How to carry out maintenance on the steel structure of the multi story steel structure house and car shed?

1. When cleaning the steel structure walls in Xinjiang, attention should be paid to avoiding any disorderly conditions. Steel wire brushes, row brushes, and other floor cleaning products should not be used. When using cleaning water, it should be cleaned from top to bottom.

2. After the steel structure equipment is installed in Xinjiang, for the residents of the community, its structure cannot be replaced without authorization, anchor bolts and other prefabricated components cannot be removed, and partition walls cannot be adjusted. If there is a need to change which part, the demand should be discussed with the manufacturer to determine if it can be changed. After three years of application, steel structures have been persistently coated with paint to enhance their appearance and performance. The steel structure in Xinjiang is connected by prefabricated steel components, so electrical equipment such as cables are selected to isolate the wire ducts and pipes to avoid electric shock accidents.

3. Xinjiang steel structures are regularly organized and maintained, and under normal conditions, regular inspections and maintenance should be carried out once a year. If it is necessary to apply high elasticity nanotechnology materials to maintain the metal material roof and fully utilize the actual effect of thermal insulation, it can save the driving force of air conditioning in the room.

4. Xinjiang steel structures need to be regularly organized, maintained, and serviced. Under normal conditions, regular inspections and repairs should be carried out once a year. After three years of application, paint should be applied once to make the building look good.

5. If there is damage to the surface of the metal sheet inside the steel structure in Xinjiang, it should be repaired immediately to avoid wind, sun, and precipitation erosion of the metal sheet.

6. There are similar items such as trees and fallen leaves in the steel structure of Xinjiang, which should be immediately sorted out to prevent unnecessary inconvenience caused by inventory backlog.


 
 
 

Botou Yuyuan Steel Structure Co., Ltd

Contact: Peter Gao
Phone: +86 15822013355
Email: yysteelstructure01@163.com
Address:Development zone, Tangshan city , Hebei province, China
 

Copyright © 2024-2025 http://www.yysteelwarehouse.com. All Rights Reserved Hebei Yuyuan Steel Structure Co., Ltd. All Rights Reserved.