mobi
 
 
contact
Current Location Current Location:HOME > PRODUCTS > Steel Poultry Farm >
 
H beam steel structural cow farm building

H beam steel structural cow farm building

The design of the steel structure of the H-shaped steel structure dairy farm building is a part of its design. The steel structure cannot be exposed to the air, and long-term retent......

Product Description

The design of the steel structure of the H-shaped steel structure dairy farm building is a part of its design. The steel structure cannot be exposed to the air, and long-term retention in the air can lead to corrosion of the steel. The use of corroded steel structures in the building structure will gradually reduce the size of the components, resulting in serious building quality problems. Therefore, designers should combine the actual situation, come up with good solutions for steel structure corrosion problems, and implement better design schemes to improve the building.

Education measures for stable construction of steel structure engineering:

(1) Each helmet should have: manufacturer's name, trademark, model; Production year and month; License number. Each protective helmet needs to have a batch verification and factory inspection certificate issued by the inspection department when leaving the factory.

When wearing a helmet, it is necessary to tighten the chin strap to prevent the helmet from falling and losing its protective function.

(2) Proper use and suspension of stability belts

The length of the stable rope used in scaffolding is limited to 1.5-2 meters.

Vertical suspension, the higher the suspension, the more stable it becomes when used lower; When used for horizontal suspension, pay attention to swinging collision; Not suitable for low hanging and high use; Do not knot the rope to prevent it from being cut off under force; It is not allowed to hang the hook directly on the non-metallic steel wire rope to prevent the steel wire rope from being cut.

Before the construction of steel structure engineering in the rainy season, all on-site equipment's distribution lines, motor insulation, and rainproof performance shall be inspected and recorded; For on-site lightning protection equipment, check the connection quality between the lightning rod and the down lead, check the grounding resistance value of the grounding device, and keep records. During the rainy season construction period, it is required to conduct a regular inspection of the site once a week. After rain, the equipment needs to be inspected before it can be put into use.

Management of on-site distribution boxes and power sources

Rainproof coverage of gas equipment is subject to centralized responsibility management, with certified electricians responsible for all management.


 
 
 

Botou Yuyuan Steel Structure Co., Ltd

Contact: Peter Gao
Phone: +86 15822013355
Email: yysteelstructure01@163.com
Address:Development zone, Tangshan city , Hebei province, China
 

Copyright © 2024-2025 http://www.yysteelwarehouse.com. All Rights Reserved Hebei Yuyuan Steel Structure Co., Ltd. All Rights Reserved.