Building workshops plants prefabricated steel structure workshop

Building workshops plants prefabricated steel structure workshop

The installation tools and materials commonly used in the prefabricated steel structure workshop of the construction workshop include two sides of rock wool color steel plates and a......

Product Description

The installation tools and materials commonly used in the prefabricated steel structure workshop of the construction workshop include two sides of rock wool color steel plates and a large-span steel frame workshop steel structure shed design truss structure. In fact, the design of steel structure sheds for freight large-span steel frame workshops is a type of temporary building, commonly used in industries such as temporary dormitories for construction workers, company offices, industrial plants in processing plants, field work sites, exhibitions, warehouses, and border outposts; It can also be used for company offices, dormitories, warehouses, shops, restrooms, machinery and equipment rooms, as well as various temporary and mobile land in manufacturing industries such as engineering construction, railway lines, roads, water conservancy engineering, crude oil, and vacation tourism.

The detailed explanation process and methods for the prefabricated steel structure workshop of the building workshop are as follows:

1. The centerline specifications for each wall foundation are based on the measurement engineering drawings and the centerline specifications, with an error of plus or minus 25mm. The length to width ratio of the measured wall foundation has an error of plus or minus 11mm.

2. The raw materials for the prefabricated steel structure workshop of the construction workshop should be loaded and unloaded on site first, and transported to various construction sites. During transportation, they should be handled with care to prevent damage to the raw materials. Inspect the size and welding quality of the prefabricated steel structure workshop in the building workshop before construction.

3. According to the drawing size, first bury the chassis iron and fix it with expansion bolts and basic fixing.

4. The assembly of prefabricated steel structures in the construction workshop and factory building involves first assembling rectangular columns and steel beams with screws. During assembly, all screws must be tightened, and the steel beams must be vertical, coplanar, and the specifications of the assembled parts must meet all requirements.

5. The prefabricated steel structure workshop of the assembly building workshop first lifts steel beams, which hold square pipe columns. Steel beams should be supported and reinforced, and should be perpendicular to the road surface. The specifications should be measured with a steel tape measure. Then, two steel beams should be lifted, and sheet beams should be installed and fixed with screws. Other load-bearing beams and sheet beams can be installed in a timely manner according to the described process, and the steel beam parts should be rechecked for errors, which need to be adjusted.

6. After confirming accuracy, use angle steel to weld the horizontal support and the frame inside the steel beam, and then weld the square pipe column and the car chassis iron.

7. After the installation of columns and beams, install the floor slab. The compactness of the floor slab in the middle of the floor slab is required.

8. After laying the floor slab, the installation of the slab wall should be started. When installing the slab wall, the window and door parts should be pre embedded. After all the walls are installed, the installation of cast-in-place slabs, eaves panels, solutions, roof covers, etc. should be started.

9. After the overall installation of the house is completed, the installation of windows and doors should be carried out. The installation of windows should pay attention to density and should not have gaps with the panel walls. After the installation of windows is completed, it should be carried out to solve the problem. The installation of doors should be done flat and straight, and the environment should look clean.

10. The guardrail of the prefabricated steel structure workshop floor in the construction workshop is required to be vertically connected to the guardrail columns. The ladder steps should be made of patterned steel plates or angle steel, and the floor should not shake. The indoor stairs should be fixed to the umbrella wall, and the guardrail board should be fixed to the indoor stairs with 75mm self drilling self tapping screws.

11. Pour the top epoxy floor, install the cables, and then splice the PVC ceiling buckle plates.


 
 
 

Botou Yuyuan Steel Structure Co., Ltd

Contact: Peter Gao
Phone: +86 15822013355
Email: yysteelstructure01@163.com
Address:Development zone, Tangshan city , Hebei province, China
 

Copyright © 2024-2025 http://www.yysteelwarehouse.com. All Rights Reserved Hebei Yuyuan Steel Structure Co., Ltd. All Rights Reserved.